Wednesday, October 5, 2011
Bellewood material package and dry in estimate
Bellewood model with standard material package and dry in estimate
Under $225,000.00 for material package and dry in labor.
This is an estimate for your budget purposes. It includes our:
• 8x8 D or round logs
- or -
• 6x12 D or flat logs
• heavy timber roof system
• loft over great room foyer
• two bathrooms on 2nd floor
• attached family room with log siding outside and inside
• standard windows and doors
• Added windows and doors for walkout basement
• Stain for exterior and interior
Year end sales event discounts could be up to $5,000 based on delivery date.
Not included are:
• shingles or metal roof
• window and door upgrades
• interior banisters and spindles for loft
and
• permit fees
• site prep
• foundation and basement
• well
• septic
• rough construction driveway
• engineer stamp on your floor plans if needed
This estimate does not reflect exact shipping charges to your future home site, applicable state sales taxes and contractor fees.
Saturday, October 1, 2011
Cancelled = Log Raising at Smith Mountain Lake
CANCELLED
What: Log Raising **
When: Saturday October 22, 2011
What Time: 10:00 am to 1:00 pm
Where: Showroom on Rt 122 at Smith Mountain Lake. 16483-G Moneta Road. Moneta VA 24121
How: Learn how a log cabin is erected
** The photo above implies that you are going to see full size log home construction. Not today. We are going to construct several courses of a log home. We will show how the first course is set, windows rough in and a partial roof system.
Cost: FREE
Refreshments: Juice. Coffee. Pastries.
Chairs: Bring your own. No chairs provided.
Tent: In the parking lot. Rain or shine, the show must go on.
Prizes: Register for prize drawing
Questions: Contact Jack Hutslar at 800 767-4916 or Jack@LogHomesByJack.com
Follow us: www.Twitter.com/JackHutslar
OR: www.Facebook.com/JackHutslar
Savings Reminder: Year End Sales Event ends December 31, 2011
Subscribe to:
Posts (Atom)